Mat-11: Local Sourcing

Mat-11: Local Sourcing

Product may assist in a project obtaining credits as the production and material resources are sourced locally. One point is awarded where 20% of the contract cost is represented by products or materials sourced within 400km of the building site.  An additional point may be awarded where 10% of the total contract cost is sourced within 50km of the site. To qualify for this credit, products and materials must be permanent in the building and be harvested, extracted, recovered, and manufactured within the prescribed radii of the site.

Points Available

2